My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-17_PERMIT FILE - C1981035A (17)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035A
>
2007-08-17_PERMIT FILE - C1981035A (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:41 PM
Creation date
12/6/2007 11:17:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
PERMIT FILE
Doc Date
8/17/2007
Doc Name
Licenses and Permits
Section_Exhibit Name
KI Appendix 02
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />• of C~10 <br />COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT y~~ ~ ~o <br />AIR POLLUTION CONTROL DIVISION <br />TELEPHONE: (303) 692-3150 '*** <br />*1876~ <br />CONSTRUCTION PERMIT <br />PERMIT NO: 82LP034-1 F <br />FINAL APPROVAL <br />DATE ISSUED: JANUARY 28, 2004 Name Change <br />ISSUED TO: National King Coal, LLC <br />THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: <br />Surface facilities/activities, supporting underground coal mining, located at 4424 County <br />Road 120, Hesperus, La Plata County, Colorado. <br />THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES THE FOLLOWING: <br />Coal handling, stockpiling, and hauling. These activities generate emissions of fugitive <br />particulate matter. <br />• THIS PERMIT IS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE COLORADO AIR <br />QUALITY CONTROL COMMISSION AND THE COLORADO AIR POLLUTION PREVENTION AND <br />CONTROL ACT C.R.S. (25-7-101 et sep), TO THOSE GENERAL TERMS AND CONDITIONS INCLUDED <br />IN THIS DOCUMENT AND THE FOLLOWING SPECIFIC TERMS AND CONDITIONS: <br />1. The particulate emission control measures listed on the attached page (as approved by the <br />Division) shall be applied to the particulate emission producing sources as required by Regulation <br />No. 1, Section III.D.1.b. <br />2. The Division's approval of the control plan is based on the submitted production level as listed <br />below. Prior to any increase in daily or annual production rates, the applicant shall submit an Air <br />Pollutant Emission Notice and Control Plan revision which will be subject to Division review and <br />approva- to ensure compliance with the National Ambient Air Quality Standards for particulate <br />matter. Records of the actual production rate shall be maintained by the applicant and made <br />available to the Division for inspection upon request. (Reference: Regulation 1, III.D.1.b.) <br />Handling of coal shall not exceed 6000 tons per day and 800,000 tons per year. <br />This activity shall not result in the exceedence of the following emissions of fugitive total <br />suspended particulates (TSP) and fugitive particulate matter of less than ten microns (PM,o). <br />These emission limits are based on the production rates listed above. The Division assumes that <br />these levels are being met if the control measures stated in the approved control plan are followed <br />and the stated process rates are not exceeded. <br />Total Suspended Particulate <br />Particulate Matter (PM10) <br />• <br />067/0015/001 <br />43.12 tons per year. <br />17.54 tons per year <br />ver. 2/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.