Laserfiche WebLink
TASK 24 FINAL DRAINAGE CHANNEL CONSTRUCTION 100 YR STORM <br /> <br />r ~ ~~C. <br />~ ;1 G . <br />.~ 3 5 <br />Ditch Design Freeboard Length Slope Design Xsec Areal Manning's Ex va o <br />i <br /> Flow Capacity (ft) (°~) Design+ Fneeboard Velocity Vol <br />F equ <br />r <br /> (~) (~) Xsec Area (ft') (fPs) `M'S OiYAI E~~~~ <br /> <br />A 4.4 8.5 100 2% 3.0 / 6.0 2.8 600 ' e <br />B 10.6 17.3 330 4% 4.0 / 7.5 4.3 2475 Fabric <br />C 4.6 5.5 350 1.5% 1.0 ! 4.0 3.7 1400 None <br />D 1.5 2.7 770 4°~6 1.0 / 3.0 2.7 2310 None <br />E 4.6 5.2 190 14.5°~ 3.0 / 6.0 5.8 1140 Ri ra <br />F 4.4 6.9 35 42.9°r6 1.0 / 3.0 6.9 105 Ri ra <br /> Totals CF 1.2Swell /27 = 297LCY <br />Manning's n for ditches A, B, C, D, = 0.025. Manning's n for ditches E & F, (riprap) = 0.050. <br />DITCH SIZING <br />I~-~ <br />I~ <br />Ditch A Ditch B <br />`~~Ti'I''_IS'[','L~ ,"~: L'' 1 O~`J }.1t L `I~11TL~ITL.~+' Ii 4lii- 1. <br />I~. T ~ ~~y T I I rI ~Ti_ i c - ~~ i rte. ~Ti~. <br />T._Lt=I L~ _ I <br />I I 21`SIDE SLOPE <br />DITCH E 8 F DESIGNS WITH RIPRAP <br />Ditch C <br />Ditch D <br />~6.0~ ~5.0 '-{ <br />_F - z `.7i-~-r`te` err 4-'= 1 0 5 l -~-L. I I~'., i, l <br />rZ-rr~:rT]~LL~~r 1 It'~_rJ I I ~ 1 <br />-2~~ \ ~ ~`1.0~ <br />2'1 SIDE SLOPE <br />2:1 SIDE SLOPE <br />4.75 SQ. FT. <br />COST ANALYSIS: <br />Excavate 319LCY with Cat 307C. 5193 Total time = 3.1 <br />1.0 SQ. F-f. <br />Using RS Means Site Work for riprap placement: Xsectional area for riprap = 4.75 cfnineal foot of channel. <br />(Channel E + F) x (Xsec) = 260ft x (4.75ft~) = 1,235cf, ~ 46cy <br />Machine placed costs = (46cy) x ($27.45) ~ 51263. Rate of placement is 62cy/8hr, 46/62 (8hr) = 5.9 hours. <br />4 <br />Y <br />~~o <br />Cost of riprap = ($35/ton)(1.425tons/cy)(46cy) = 52294• <br />• . ,,..:- <br />Filter fabric costs: 90' x 8' roll =$38. 6"staples/roll @ $7. Ditch B @ 330'/90' x ($45) =1165. Assume 8 hrs installation <br />time. <br />Total costs: 13915 Total time: 17 hrs <br />