Laserfiche WebLink
CIRCES Cost Estimating Software <br /> MOTOR GRADER WORK <br />:<. <br /> <br />__.._._. <br /> PROJECT IDENTIFICATION <br /> Task # : 018 State :Colorado Permit/job # : C-81-035 <br /> Date : 07/11/2007 County : La Plata Abbreviation :none <br /> User : TAK Site :King 1 Mine Filename : C035-018 <br /> <br /> Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br /> Permit or other job action : Pe-mit Renewal RN-05 <br /> Task description : Finish-grade refuse area (area #6, current law) <br /> <br /> HOURLY EQUIPMENT COST <br /> Basic machine :CAT 12H Horsepower : 140 <br /> <br /> Attachment no. 1 : NA Shift basis : 1 per day <br /> Attachment no. 2 :Multi-shank ripper <br /> Data source : (CRG) <br /> Utilization <br /> Cost Breakdown Ownership cost/hour : $23.24 NA <br /> Grader operating cost/hour : $29.05 100 <br /> Ripper operating cost/hour : $0.00 0 <br /> Operator cost/hour : $24.47 NA <br /> Total unit cost/hour : $76.76 Total fleet cost/hour : $76.76 <br /> <br /> MATERIAL QUANTITIES <br /> Total area to be graded or ripped : 1.06 acres <br />Source of estimated acreage :Map C-6 <br />HOURLY PRODUCTION <br />Selected application <br />Average grader speed <br />Selected blade angle <br />Effective blade length <br />Finish grading (0-2.5 mph) <br />1.25 mph <br />30 degrees <br />10.40 feet <br />2.00 feet <br />8.40 feet *' <br />* at 0 degrees, blade is perpendicular <br />to direction of travel. <br />Width of blade overlap per pass <br />Net grading or ripping width per pass <br />Unadjusted hourly unit production <br />1.2727 acres/hour <br />"width of ripper beam on ripping applications <br />Job Condition Correction Factors Source <br />Average site altitude : 7,400 feet Altitude adjustment factor : 0.83 (Cat HB) <br /> Job efficiency adjustment factor : 0.85 (1sh/d, mod.) <br /> Net job correction : 0.7055 multiplier <br /> <br />Adjusted hourly unit production : 0.8979 acres/hour <br />Adjusted hourly fleet production : 0.8979 acres/hour <br /> <br />JOB TIME AND COST <br />Fleet size : 1 grader(s) Total job time : 1.18 hours <br />Unit cost : $85.48 per acre Total job cost : $91 <br /> <br />