My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-17_PERMIT FILE - C1981035A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035A
>
2007-08-17_PERMIT FILE - C1981035A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:42 PM
Creation date
12/6/2007 11:09:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
PERMIT FILE
Doc Date
8/17/2007
Doc Name
Reclamation Bond Information/Estimates
Section_Exhibit Name
KI Appendix 12
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY EQUIPMENT COST <br /> Basic machine :Cat D8R Series 11 - 8SU (200: Horsepower : 310 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br /> Attachment no. 2 : 3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $58.24 NA <br /> Operating cost/hour : $73.75 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $164.77 Total fleet cost/hour : $164.77 <br />MATERIAL»>~`UANTITIES~::::::::> :.......... <br />Q .......................................................................................................................... ................................ ........................... <br />Initial Swell Loose <br />volume : 2,339 LCY factor : NA volume : 2,339 LCY <br /> <br />Source of estimated volume :6" thick X 0.58 acre <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION:::::; .............. ............................................... <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 852.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Loose stockpile Spoil pile : 0.80 (fnd-r~ <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,400 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.47 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />Adjusted unit production <br />Adjusted fleet production <br />403.95 <br />403.95 <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 5.79 Hours <br />Unit cost : $0.408 /LCY Total job cost : $954 <br />
The URL can be used to link to this page
Your browser does not support the video tag.