Laserfiche WebLink
Proieet Ident~eation <br />• Task #: 001 <br />Date: 8/14/2007 <br />User: TAK Site: King I Mine <br />Permitting action: RN-05 <br />Task description: Demolish structures, remove materials and debris <br />• <br />STRUCTURE or ITEM DESCRIPTION <br /> fl R fl <br />Haul and dispose of two office trailers 12 120 10 <br />Portal building 12 20 <br />Main conveyor <br />Tipple building 60 65 <br />Tipple lean-to shed 18 45 <br />East bins 18 25 5 <br />Mine fan 4 6 30 <br />Mine fan 4 6 1 <br />Stacker wnveyor <br />Stacker tower#1 10 20 5 <br />Stacker tower #2 8 12 2 <br />Remove two 500-gallon gas tanks 50 <br />Bum Vash, bury debris 10 10 40. <br />Scale house 40 42 1 <br /> 12 <br />Demolition Work <br />Total before location adjustment $40,761.42 <br />Location adjustment: 92.32% Total after location adjustment $37,630.94 <br />Page 1 of 1 <br />Agency Or organization name: Colorado Division ciReclamafion, Mining antl Safety <br /> Permitlob#: C-81-035 <br /> Abbreviation: N/A <br /> Filename: cb35-001 <br /> Source of unit costs: CIRCES <br /> Location adjustment: 92.32 <br /> Last unit wst update: 7/1/2006 <br />QUANTITY UNIT CIRCES DEMOLITION MENU SELECTION UNIT COST TOTAL COST <br />If in <br />14,400 CF Demo/disp./appr. landfill - 15 mi. haul $0.6690 $9,633.60 <br />1,920 CF Demo/disp./appr. landfill-Smi.haul $0.6490 $1,246.08 <br />40 40 LF Conveyor, elevated - 5' W x 6' H $36.8600 $1,474.40 <br />31,200 CF Demo/disp./existing pit- 200' push $0.1310 $4,087.20 <br />6,480 CF Demo/disp./existing pit - 200' push $0.1310 $848.88 <br />22,500 CF Demo/disp./existing pit - 200' push $0.1310 $2,947.50 <br />720 CF Demo/disp./appr. landfill - 5 mi. haul $0.6490 $467.28 <br />240 CF Demo/disp./appr. landfill - 5 mi. haul $0.6490 $155.76 <br />300 300 LF Conveyor, elevated - 5' W x 6' H $36.8600 $11,058.00 <br />10,000 CF Demo/disp./appr. landfill - 5 mi. haul $0.65 $6,490.00 <br />2,400 CF Demo/disp./appr. landfill - 5 mi. haul $0.65 $1,557.60 <br />2 DRUM Haz waste -Drum mat. 1-6 dr. $397.56 $795.12 <br />4,050 CF Demo/disp./existing pit - 200' push $ 0.131 $530.55 <br />16,800 CF Demo/disp./existingpit-200'push $0.13 8 <br />8 <br />8 <br />0 <br />0 <br />0 <br />5 <br />0 <br />5 <br />$2,200.80 <br />0 <br />J <br />