Laserfiche WebLink
• <br />(6) Water Depletion Estimate of Colorado River Basin for <br />S uawfish Preservation <br />USDA Im ortaat Farmlands of La Plata Coun Colorado 9 <br />Structure Des s 10 <br />1 Waste Bank Desi • Don Ma P.E. <br />2 Haul Road Certification <br />3 Stee Cut Slo a Certification <br />H drolo c Des s 11 <br />(1) Hydrologic and Hydraulic Design of Sedimentation Ponds and <br />Other Draina a Features for National Kin Coal Mine• Don Ma P.E. <br />2 Small Area Exem tion # 1 Haul Road North of Ponds <br />Reclamation Boad Information/Estimates 12 <br />1 Letters from Surface Landowners <br />2 Letters from Private Reclamation Contractors <br />(3) Soil Samples, Analysis Results -Topsoil Borrow Area 8s Subsoil <br />Stora a Area Soil Sam les Anal sis Results <br />4 Pre-Blast Surve -Marc & Julie Crawford Residence <br />(5) Reclamation Bond Calculation prepared by National King Coal, <br />LLC <br />6 Reclamation Bond Calculation re aced b CDRMS <br />Environmental Assessments 13 <br />(1) Coal Lease Modification Application for Leases C-29125 and <br />COC-49465 (PR-05) Prepared by: Bureau of Land Management <br />Coo eratin A enc :Office of Surface Minin Au st 1996 <br />(2) Environmental Assessment, EA Number CO-SJFO-00-O10EA, <br />National King Coal, LLC, Coal Lease Modification Application, Lease COC- <br />60941 (PR-07) Prepared by: Bureau of Land Manage <br />Coo ratin A en :Office of Surface Minin December 1999 <br />Insurance: Personal I 8s Pro ert Dama a 14 <br />Bon Information lb <br />National King Coal, LLC King I Mine <br />Page iii February, 2007 <br />