My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-19_HYDROLOGY - M2007044
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2007044
>
2007-11-19_HYDROLOGY - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:18:32 PM
Creation date
12/4/2007 4:10:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
HYDROLOGY
Doc Date
11/19/2007
Doc Name
As-Built Reprot, water treatment system Whirlwind Mine
From
Energy Fuels Resources Corporation
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5.3 If sufficient access is available, GCL may be deployed by suspending the roll at the top of the slope <br />with a group of laborers pulling the material off of the roll and down the slope (Figure 8). <br />5.4 GCL rolls should not be released on the slope and allowed to unroll freely by gravity. <br />5.5 Care must be taken to minimize the extent to which the GCL is dragged across the subgrade in <br />order to avoid damage to the bottom surface of the GCL. Care must also be taken when adjusting <br />Bentomat CLT panels to avoid damage to the geotextile surface of one panel of GCL by the textured <br />sheet of another panel of GCL. A temporary geosynthetic subgrade covering, commonly known as a <br />slip sheet or rub sheet, may be used to reduce friction damage during placement. 1 <br />UNROLLING BENTOMAT <br /> <br />BENTOMAT/CLAYMAX Installation Guidelines - 8 Of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.