When installing over certain geosynthetic materials, a 4-wheel, all-terrain
<br />vehicle (AN) can be used to deploy the GCL. An AN can be driven directly on
<br />the GCL provided that no sudden stops, starts, or turns are made.
<br />2.6 Additional equipment needed for installation of CETCO's-G:CL~=i_rzdu~es ~_=~ _-~~
<br />• Utility knife and spare blades (for cutting the GCL). ~,' j ~~ ~ ~,~; ,4 ,4
<br />1 .~~ ~ i~''' t;. ~, ,
<br />• Bentonite mastic (for sealing around structures and details) and/o'r granular„bentonite
<br />ly
<br />(for end-of-roll seams-of;,GCLs with needle punched; non-woven geotextiles a" d, for
<br />~~._. ~ ~,~ ~^~~ ~,~';~ ~~ali;ng around structures and~,detaiLs). Both.are--available from CETCO: ~~ _ ~
<br />-- ~ ~^ • Waterpro f,tarpaulins (for temporary over on installed;matenal~as well~as for_stockpiLed,rolLs): ~j ~ `
<br />II ~ _:~._ ~ ..- ,,. __
<br />;~, , ~~, r iiiir!„Optionalfht-bladed vise gnps,(for~posit~oning the GCL panel by~han~l.)..== ~--- ~~,,_s..~= ~
<br />~= ~ - ~ 1
<br />i~-r ~ ~~, 2`7 ,i'Th~e~CETCO E-asy,RollerTM GCL De,p~oyme t System is a preferred method gf~installing ~ ! - - _
<br />.~~~~~, l.~ ~.,:bgeosy,nthetic clay liners. Use of the~,Easy Roller'tsystem,eliminates=the need..:for=spreader ba~s~ -:~ r
<br />~ _ __
<br />_i__ ~~__ ,__~--_-- ` .'' and'hea cor-e- i. es.__.Installation`s `eed and workersafet pare s'~ nificantl increased~'~~~=
<br />,~ vy-- p p f ~ p ~- y -~ ~g ~ y ~"
<br />~ ~~ ~ ~ ~
<br />~ j ~ '=~~For further details, contact CETCO.~=_~. ~ ~'~ ~ `>~~ ~~~~~-- ,~~'"°.~~`j~~ -~-
<br />~ ~ Ii..1+____~~ ~~i ~.~,,..,.,...j..,a.., ~~~ 1 ail ~~ ~ j ~ --~; i ~~t .~~ .1~ ~c_.~_. "4L•"•o,.,.-;~`'~ w„`~ -- '_
<br />~~,SHIPPLNG; UNLOADING & STORAGE ~~= ~ ~ ~ ~~=1~"~~~ ~'`1` - ~~`~~~
<br />a~'31~~-'..._.AtL'lot and roll numbers should be recorded and compared to the packing list. Each roll of GCL
<br />should also be visually inspected during unloading to determine if any packaging has been
<br />damaged. Damage, whether obvious or suspected, should be recorded and the affected
<br />i rolls marked.
<br />3.2 Major damage suspected to have occurred during transit should be reported immediately to the
<br />carrier and to CETCO. The nature of the damage should also be indicated on the bill of lading"
<br />with the specific lot and roll numbers. Accumulation of small amounts of moisture within roll
<br />packaging is normal and does not damage the product.
<br />3.3 The party directly responsible for unloading the GCL should refer to this manual prior to shipment
<br />to ascertain the appropriateness of their unloading equipment and procedures. Unloading and
<br />on-site handling of the GCL should be supervised.
<br />3.4 In most cases, CETCO GCLs are delivered on flatbed trucks. There are three methods of
<br />unloading: core pipe and spreader bar; slings; or stinger bar. To unload the rolls from the
<br />flatbed using a core pipe and spreader bar, first insert the core pipe through the core tube.
<br />Secure the lifting chains or straps to each end of the core pipe and to the spreader bar
<br />mounted on the lifting equipment. Hoist the roll straight up and make sure its weight is evenly
<br />distributed so that it does not tilt or sway when lifted.
<br />3.5 At the customer's request, CETCO GCLs may be delivered with two 2" x 12' (50 mm x 3.65 m) Type V
<br />polyester endless slings on each roll. Before lifting, check the position of the slings. Each sling
<br />should be tied off in the choke position approximately one third (1/3) from the end of the roll.
<br />Hoist the roll straight up so that it does not tilt or sway when lifted.
<br />® BENTOMAT/CLAYMAX Installation Guidelines 5 of 15
<br />
|