Laserfiche WebLink
FL,48 SAND AND ®RAVEL CO. <br />NOVEMBER 29, 2007 <br />FsAO E 2 <br />current mining area since the slopes are shaped as mining <br />progresses. Topsoil is stored along the perimeter of the <br />mined area and the river for use in resoiling the slopes. <br />We continue to monitor revegetation done on the north shore <br />of the west lake area. <br />(3) Mining will continue east of the Plant Site in the area <br />colored purple. We expect to continue to mine on the floor <br />of the previously mined and strip an additional 3.35 acres t <br />next year. We will continue to monitor the west lake slopes <br />and do remedial work if it is necessary. <br />(4) No reclamation is required next year in the Plant Site area <br />or in the mining area east of it. The western parcel may be <br />seeded on the above water slopes next year. <br />(5) The bond was evaluated in 1999 and set at $55,400. Review <br />of that evaluation and this annual report show that less <br />area is disturbed at this time than existed in 1999. Recla- <br />mation, except seeding, is complete on the western 59.81 <br />acres ~ of the site. The total disturbance on above water <br />areas at this time is 28.13 acres t, which is less then <br />allowed under the current bond. We feel bond is adequate to <br />cover all reclamation requirements for this year. <br />The effective date of all information contained in this <br />report is November 19, 2007. If you have any questions please <br />call. me. <br />Sincerely, <br />,=.r ~„,~,~.i~ <br />Fred Frei <br />President <br />cc file <br />Environment, Inc. <br />enclosure <br />