Laserfiche WebLink
TRI COUNTY GRAVEL ~cSoJ <br />PERMIT # M 1977-205 <br />PHASE 1 AND 2 REVISION RECLAMATION PLAN <br />Tri County Gravel in conjunction with NFRIA river restoration has revised the river channel in <br />Phase 1 and will be a permanent lake. At the present time phase 1 is not mined completely out. <br />United Companies in a TR are planning to join phase 1 and 2. Mining has occurred in Phase 2. <br />United Companies are in the process of a TR. When the TR is approved and the Instream <br />Mining portion of the permit is released Tri County Gravel Permit will be signed over to United <br />Companies. The Instream Mining on the permit should be released by December 31, 2007. <br />2006 map enclosed and it reflects the phase 2 portion which was mined last year. United <br />Companies TR is in a adequacy review and should be approved soon. <br />