My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-28_HYDROLOGY - C1981019
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981019
>
2007-11-28_HYDROLOGY - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:18:50 PM
Creation date
11/28/2007 2:46:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
HYDROLOGY
Doc Date
11/28/2007
Doc Name
Section 28 Pond As Built Certification and Construction Report
From
Colowyo Coal Company
To
DRMS
Permit Index Doc Type
Prof Pond Certifications
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Report -Section 28 Pond <br />Construction Report <br />Section 28 Pond <br />As required by Rule 4.05.9 (14), the following report is provided to document <br />construction information upon completion of construction. <br />The impoundment was constructed by Anson Excavating during August through <br />November, 2007. Design information for the pond is presented in Volume 13, Exhibit 7, <br />Item 20, Part A of the Colowyo Mine permit. <br />A preconstruction meeting was held with Mike Anson, Dusty Wiseman, Juan Garcia, <br />Alan Jorgensen, Tay Tonozzi, and Tom Peterson on July 12, 2007. Following is the <br />proposed list of equipment to be used for construction: <br />• Cat 433 Sheepsfoot <br />Cat 325 Backhoe <br />• Cat D7 or D8 Dozer <br />• 650 Water truck (as needed) <br />• two Komatsu 350 articulated dump trucks <br />Topsoil removal from the pond footprint was salvaged in a new stockpile constructed <br />below the toe of the embankment. All topsoil from the impoundment footprint was <br />removed from the impoundment interior as of August 8, 2007. An estimated 1,059 <br />cubic yards were stockpiled based on the final field survey. <br />Survey control was provided by Jerry Magas of Colowyo Mine. The following control <br />points were established, and the contractor then used this information to provide their <br />own survey information during construction. <br />Name Northing Easting Elevation <br />S28B 327202.41 1347405.18 7371.95 <br />S28C 326699.85 1346978.06 7198.54 <br />S28D 326150.87 1347092.88 7048.31 <br />S28E 325801.39 1347130.34 7026.28 <br />Six separate borrow samples were obtained and sent to NWCC Laboratories for testing. <br />Atterberg Limits, Proctor tests, and gradational analyses were obtained for all four <br />samples. The samples were designated as samples P5 through P10. Samples P5 and <br />P6 were obtained from the interior of Prospect Pond, as it was determined that <br />materials removed during cleanout operations at this impoundment might be used for <br />some of the Section 28 embankment fill. In practice, timing of these two separate <br />activities did not coincide and thus these results can be ignored. <br />Proctor Samples P7 and P8 were obtained from the interior of the Section 28 Pond, and <br />all available excavation from the interior was eventually placed within the embankment. <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.