Laserfiche WebLink
Ownership Costs Overhaul and Operating Costs <br />ADJUSTED COSTS Overh aul Field R epair <br /> reciation <br />De CFC Overhead Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br /> p N NA NA NA NA <br />Acquisition cost : $18.34 NA NA NA NA NA A NA NA <br />Econ.life -Dozer and ROPS : $18.34 NA NA $7.24 $13.70 $8.05 $13.21 NA NA NA NA <br />-Attachment no. 2 : NA NA NA $1.21 $1.30 $2.21 $1.31 NA NA NA NA <br />Annual usage : $27.67 $12.45 $17.29 NA NA NA NA NA NA <br />Double shifts : $20.75 $6.22 $8.64 NA NA NA NA NA NA NA NA <br />Triple shifts : $18.46 $4.14 $5.76 NA NA NA NA NA NA NA NA <br />NA <br />Mechanic labor-Dozer and ROPS : NA NA NA $5.65 NA $6.28 NA NA NA NA NA <br />-Attachment no. 2 : NA NA NA $0.94 NA $1.72 NA NA NA NA <br /> ~ NA NA NA NA NA NA $30.56 $6.01 $0.00 $2.02 <br />Fuel/tube -Dozer and ROPS : NA NA NA NA $0.00 $0.34 $0.00 $1.09 <br />Attachment no. 2 : NA NA NA NA ~ , <br /> <br /> <br />ADJUSTED COST SUBTOTALS _ _ _ <br /> <br />~ Ownership Costs ~ _ _ ~, <br /> <br />Overhaul an <br />'°- <br />d Operating Costs <br />- <br />- <br /> Overhaul Field Repair <br /> Depreciation CFC Overhead Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br /> <br />Dozer, ROPS and Attachment no. 2 : <br />29 Dozer and ROPS <br />70 <br />65 $13 <br />$5 <br />$6 <br />28 <br />$13.21 <br />$30.56 <br />$6.01 <br />$0.00 <br />$2.02 <br />Single shifts : $27.67 $12.45 $17. . . . <br />Double shifts : $20.75 $6.22 $8.64 ttachment no. 2 <br />72 <br />$1 <br />31 <br />00 <br />$D <br />$0 34 <br />$0 00 <br />$1.09 <br />Triple shifts : $18.46 $4.14 $5.76 $0.94 $1.30 $1. . . ~ <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20% 9.80% ($Ihr) Shift Differential Colorado labor zone : 2 <br /> $20 <br />67 $7:22 $1.58 $1.28 $2.03 $32.78 Day : $D.00 Two shift per day average : $0.15 <br />Dozer operator (< 70hp) . $1 <br />58 $1 <br />28 $2.03 $32.78 Swing : $0.30 Three shift per day average : $0.25 <br />Dozer operator (>=70hp) $20.67 $7.22 . . <br />Mechani $20.97 $7.22 $1.60 $1.30 $2.06 $33.15 Night: $0.45 <br /> <br />HOURLY EQUIPMENT COST SUMMARY <br />Ownership <br />Operating and Overha <. <br />ul <br />Operator <br />Total <br /> Machine Attach ments Cost/hr ($) <br /> Single shifts : $57.40 $77.43 $6.71 $32.78 $174.31 <br /> Double shifts : $35.62 $77.43 $6.71 $32.93 $152.68 <br /> Triple shifts : $28.36 $77.43 $6.71 $33.03 _ $145.52 <br /> -- - - _ <br />EQUIPMENT PERFORMANCE DATA Horsepower Transmission Weight Length Width Height Fuel Ripper <br /> Description (FHP) Type (UST) (ft) (ft) (ft) type type <br />Dozer :Cat DSR Series 11- 8U (20 310 NA 41.8 22.8 8.7 11.5 diesel NA <br />Blade :Universal NA NA 6.0 NA 14.0 5.7 NA NA <br />Attachment no. 1 : ROPS Cab NA NA NA NA NA NA NA NA <br />Attachment no. 2 : 3-shank ripper NA NA 5.4 3.6 7.1 2.6 NA Adj. Parallelogram <br /> Total weight : 53.2 (UST) <br />