Laserfiche WebLink
_ ~y <br />a <br />April 12, 1996 <br />Basin Resources <br />14300 Highway 12 <br />Weston, Colorado 81091 <br />Attention: Mr. Bob Montgomery <br />Subject: Compaction Testing and Groundwater Measurements <br />New Elk RDA <br />Golden Eagle RDA <br />New Elk Waste Development Pile <br />Weston, Colorado <br />Job No. 22,905 <br />Gentlemen: <br />Attached are the location, elevation and results of the field compaction testing <br />performed on March 22,1996. Elevations were provided by Basin Resources based <br />upon altimeter readings. The test results indicate compaction generally exceeds 90 <br />percent of maximum standard Proctor dry density (ASTM D 698) with the exception <br />of the New Elk Waste Development Pile. We previously performed three standard <br />Proctor moisture-density tests (ASTM D 698) for each coal waste area. Additional <br />laboratory testing was not performed for this ske visit. The percent compaction was <br />determined relative to the highest previous Proctor value for each facilky. Addftional <br />compaction is recommended for the New Elk Development Waste Pile. <br />We also measured groundwater in the monitor wells on the lower three <br />benches of the New Elk RDA. The results are presented on Table 1. The <br />groundwater measurements indicate water levels are below the base of the coal <br />refuse. If you have question, please call. <br />Very truly yours, ,~~O~ Ht( <br />i 228© <br />;~~y~//• a <br />Mar G. Gray, P. ,-~'~ <br />Project Manage <br />Reviewed by: <br />~~ ~~ <br />Ronald M. McOmber, P.E. <br />Principal <br />MGG:RMM:dd CTL/THOMPSON, INC. <br />(3 copies sent) CONSULTING ENGINEERS <br />19'1 WEST 12TH AVENUE ~ DENVER, COLORADO 80204 ~ (303) 825-0777 <br />