My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP52711
DRMS
>
Back File Migration
>
Report
>
REP52711
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:57:13 AM
Creation date
11/27/2007 1:26:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984036
IBM Index Class Name
Report
Doc Date
6/1/2000
Doc Name
ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Varra Companies, ~c. <br />Office of Special Projects <br />1431 East 16th Street Greeley, Colorado 80631 Telephone (970) 353-8310 FAX <br />Annual Report - M84-fl36 -Pat 109 (Dakolios <br />Thursday 1 June 2000 <br />Extraction is complete through phase ix. Operations are focusing on <br />compacting and grading pit walls to 3h;1 v at this location to comple <br />reservoir. In 2000, the plant and stockpiles presently in Area III will be <br />allow for extraction activities in Area III. A technical revision to reflec <br />changes will be provided in 2000 to reflect this intent, and to reflect E <br />domain considerations presently pending as they pertain to the plane <br />extension of sewer lines along St. Vrain Creek by St. Vrain Sanitation C <br />353047 <br />the <br />to <br />these <br />Reclamation of the Southern portion of Dakolios, through phase ix will continue <br />through the summer, with resoiling of the upper portion of complete slopes, with <br />planned seeding in the Fall 2000. The planned technical revision ma change the <br />present seed mixture and methodology. <br />Fill operations continue to decrease the area of the existing Dakolios pond, as <br />reported in last years annual report, A portion of the pond may be s t aside from <br />continued fill if we pursue wetland banking with the Army Corps of E gineers. We <br />hope to make a determination as to whether or not to pursue banki g later this <br />year, and will notlfiy the Division if the initiative is made at the time oft e planned <br />technical revision. An estimate of the additional fill since last years a nual report is <br />shown in blue ink on the included map. <br />
The URL can be used to link to this page
Your browser does not support the video tag.