s
<br />According to C.R.S. 34-32-I 16(3), and C.R.;
<br />the operator shall submit a report and a map
<br />reclaration accomplished to date and durine
<br />during the upcoming year, and reclamation [t
<br />a report and map to enclosed annual report fc
<br />the atrove elements may suffice for a written
<br />If your operation is subject to the provisions
<br />provide with the Annual Report the follower
<br />(i) the condition of [he operation at
<br />(ii) what specific measures have bee
<br />standards and Environmental Protection Plan
<br />(iii) plans for resumption of mining
<br />Please provide the additional following
<br />(a) Per the requirements of 2 CCR
<br />regarding the sufficiency of the vale
<br />(i) Per the requirements of
<br />statement regazding [he suffi
<br />irrevocable letters of credit, 1
<br />credit, and first priority liens
<br />(ii) Per the requirements of
<br />Deed of Trust or a Security
<br />independent appraiser, indit
<br />- - - -anycrrcwnstances-v
<br />and the value of the
<br />proof that there are no
<br />(i) Per the requirements of
<br />Irrevocable Letter of Credit,
<br />of a balance sheet, certified
<br />Credit does not exceed ten t
<br />(ii) Per the requirements of
<br />Priority Lien on any fixtures
<br />detail to fully describe [he cc
<br />
<br />34-33.i-I 16(3)(x), on the anniversary date of the permit each year,
<br />swing the extent of current disturbances to affected land,
<br />~e preceding year, new disturbances that are anticipated to occur
<br />will be performed during the upcoming year. Please attach such
<br />n. (An adequately labeled map that clearly delineates and includes
<br />'Temporary Cessation as defined in the .4ct and Rules, you must
<br />information as required by 2 CCR 407-1, 407-4, and Rules
<br />i
<br />to time of cessation;
<br />and will be implemented to comply with reclamation, performance
<br />requirements, if [hey are part of your approved application; and
<br />I
<br />rerations. ~
<br />Cation with your Annual Report, as applicable:
<br />)7-I, 407-4, and Rules 1.i5(l), provide an updated statement
<br />of the Financial Warranty, specifically: ~
<br />CCR 407-1, 407-4, and Rules 1.15(1)(ai, provide an updated
<br />iency of the value of the financial warrart[y. Specifically, ~
<br />seeds of Trust, and security agreements, self-insurance, salv~a¢e
<br />an project related fixtures.
<br />CCR 407-1, 407-4, and Rules 1.15(1)(6), permits secured with a
<br />greement, the operator shall submit an update, by a qualified
<br />ting any changes in property value, and a statement summarizing
<br />~-affect the adequacy-of the-Deed of Trusr-or~€curity 5greement°---
<br />subject to either of these instruments. The report shall alsoiprovide
<br />to property taxes.
<br />CCR 407-1, 407-4, and Rules 4.7(3), permits secured with an
<br />he operator shall have the bank provide documentation in the form
<br />y a Certified Public Accountant, demonstrating that the Letter of
<br />rcent (10`70) of the bank's capital surplus accounts.
<br />CCR 407-1, 407-4, and Rules 4.93(c), permits secured by~a First
<br />tnd Equipment, the operator shall provide a report in sufficient
<br />edition, value, and location of all pledged fixtures and equipment.
<br />(b) Per the requirements of 2 CCR 4 7-l, 407-4, and Rules L15(I)(c), all monitoring informatioh
<br />required as part of the approved pe it application, to include the Environmental Protection Plari. (Please
<br />note that if you are not a Designated fining Uperation, you will not have an Environmental Protection
<br />Plan as part of your approved permit)
<br />
|