Laserfiche WebLink
<br />TABLE 1 (Continued) <br />HYDROLOGIC MONITORING SITES <br />SURFACE WATER SITES <br />SITE MONITORING FREQUENCY COMMENTS <br />Water Level or Water Quality <br />Flow & Field Sampling <br />Parameters <br />Foidel Creek <br />USGS 09233800 Monthly Quarterly (1) & (2) <br />14 Monthly Quarterly (3) <br />8 Monthly Quarterly (1) & (2) <br />USGS 09233900 Monthly Quarterly (2) <br />Middle Creek <br />USGS 09233700 Monthly Quarterly (2) <br />Fish Creek <br />l6 <br />302 Monthly <br />Monthly Quarterly <br />Monthly (t) & (2) <br />During irrigation <br /> season only; (1) & (3) <br />1002 Monthly Quarterly (1) & (2) <br />Trout Creek <br />301 Monthly Monthly During irrigation <br />season only; (1) & (3) <br />69 Monthly Monthly During irrigation <br />season only; (1) & (3) <br />NOTES: <br />(1) Included with Twentymile Coal Company's hydrologic monitoring program. If site is removed from <br />TCC's program and continued monitoring is required, CYCC will monitor site. <br />(2) Sampling will be performed on a fleaible schedule throughout normal flow period, March through <br />September. Within this time frame, flow and field parameters will be measured twelve times and four <br />full suite analyses will be conducted. <br />(3) Monthly field samples when flowing; Four monthly lab samples obtained once ronoff begins. <br />(3) First headgate of irrigation ditch downstream of mine discharge. Monitoring to begin once Fish Creek <br />Dewatering Facility is functioning. <br /> <br />I ~EMENVIRONb¢MALWM2~199TC5'CC.XLS <br />