Laserfiche WebLink
w <br /> <br />• <br />Robinson Brick Company is filing [his Annual Report providing a Notice of Intent to <br />Continue Mining Operations at Pioneer Mine located in Douglas Counry Colorado. The <br />mine is on active status, operating more than 180 days per year. The mine has a phased <br />reclamation plan. <br />Operations <br />Clay mining and overburden removal operations continue in accordance with the mine <br />plan. Clay was mined from the area outlined in brown as shown on the accompanying <br />map. <br />Permitted acreage remains at 69.3 acres. The 1999 mining campaign disturbed an <br />additional 2.2 acres of land for a grand total of 19 disturbed acres. No additional acres <br />were reclaimed during this reporting period. <br />Mining operations in 2000 will continue in the area of the 1999 mining. No additional <br />disturbance is anticipated. <br />