Laserfiche WebLink
III IIIIIIIIIIIII III <br />kerr coal company <br /> <br />one tabor center • suite 2500 <br />1200 seventeenth street • denver, Colorado 80202 <br />(303623-8317 <br />tune 910-931-2561 <br />November 24, 1987 <br /> <br />Mr. Randall Price <br />Colorado Yined Land Reclamation Division DEC 3 1987 <br />423 Centennial Building MINED Lr,tvv <br />1313 Sherman Street <br />Deaver, CO 80203 RECLAMATION DIVISIOiW <br />Re: Kerr Coal Company 1987 Annual Reclamation Report, <br />File No. C-80-006 <br />Dear Mr. Price: <br />Enclosed with this letter aze txo copies of Kerr Coal <br />Company's 1987 Annual Reclamation Report. Thin report covers the <br />period October 1, 1988, through September 30, 1987, and describes <br />all disturbance sad reclamation activities which occurred at the <br />Kerr Mine during the period. <br />Continuing poor coal mazket conditions dictated low produc- <br />tion rates which resulted in ao new azeae being backfilled, <br />graded, retopsoiled or revegetated during the yeaz. <br />Please do not hesitate to contact me with any questions or <br />comments you may have regazding the enclosed report. <br />Sincerely, <br />/~~ <br />avid Gossett <br />Chief Mining Engineer <br />DRG:seh <br />Enclosure <br />cc: Nr. George V. Patterson <br />