Laserfiche WebLink
Notice of Intent to Continue Mining Operations <br />110c Constructions_Materials Annual Report <br />Permittee Name: Siloam Stone, Inc. <br />Permit No.: M-1997-094 <br />Operation Name: Pinon Mine <br />Anniversary Date: November 20, 2007 <br />Total: $323.00 (Due on your Anniversary Date) <br />1. a. Permitted acreage: 6.26 Current Bond $ 8,300.00 <br />b. County where mine is located: Pueblo <br />2. Has your mine been granted a TEMPORARY CESSATION STATUS? YES NO <br />Does your mine operate MORE or LESS than 180 days per year MOR LESS <br />3. Does this mine have a phased reclamation plan? YES NO <br />4. Total acres affected during the report year:* 6.26 ac. <br />5. Total acres reclaimed for the report year:* 0.00 ac. <br />6. Total number of acres in topsoil replacement stage:* 1.30 ac <br />a. Average thickness of topsoil replaced: 12" in <br />7. Total number of acres seeded: NA <br />a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide the dates extraction ceased: NA <br />a. Date reclamation began: NA <br />9. The type and approximate quantity of fertilizers, organic materials or <br />soil conditioners used for the report year:* NA <br />10. Estimated total acres to be affected in the next report year:* 0 <br />11. COMMENTS : Please refer to the 2006 Annual Report Man for location of the areas of disturbance in the <br />mine We continued to remove material from stockpiles and the mined area. Those areas not mined are used <br />for topsoil stockpiles or partially reclaimed and are Continued page 2 <br />* Please show the location of the acreage for items 4 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated <br />with your timetable. For phased operations show dates extraction ceases and <br />dates reclamation began. <br />** NOTB: If there have been any changes since the last annual report and <br />you previously submitted a map which correctly depicts the current acreage <br />in items 2 through 6, then a new map is unnecessary. However, this must be <br />stated above. <br />Signature: Date• 1,~~~ ~~ <br />Please type or print current contact name, address and phone number below: <br />Contact Name: Ferd A. Mueller or Matt Mueller Phone: (719) 275-4275 <br />Company: Siloam Stone, Inc. Fax NO: (719) 275-9050 <br />Address: 315 N. 7th St. <br />Canon City, CO 81212 <br />