Laserfiche WebLink
:_ . r <br />III IIIIIIIIIIIIIIII~ <br />999 <br /> <br />BATTLE MOUNTAIN RESOURCES, INC. ~p „ ~~ <br />April 3, 1995 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Attached is the March 1995 monthly summary of cyanide analysis <br />performed on samples from the tailings pond and, and thel collection <br />pond as required by the approved TR-010. As outlined irti TR-010, <br />daily samples of the tailings pond and the collection pond are <br />analyzed on-site. TR-010 specifies a simple monthly average for <br />regulating pond compliance. The March averages are as I`ollows: <br />Monthly Pond Compliance Report - March 1995 <br />Dear Mr. Dillies <br />J <br />,hws!on v/ ~~~!rrerais s Geology <br />ne MouNwN <br />D COMPANY <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />DMG Permit No. M-88-112 <br />Tailings Pond 1.14 ppm CN-wad, 1.27 ppm CN-total <br />Collection Pond 0.58 ppm CN-wad, 0.76 ppm CN-total <br />The March simple averages show compliance with our perm:Lt standards <br />of 3.8 ppm CN-wad and 4.4 ppm CN-total. Samples collected on March <br />6 and 14 were sent to Core Laboratories for outside lab <br />verification. <br />Sincerely, <br />ACC <br />Sally aye <br />Environmental Engineer <br />Enclosures <br />cc: Anne Baldrige <br />Dan Robertson <br />Alana Scott <br />A S'URSlD/ARY UY' RA77CI: AlOUNTA/N GOLD COMPANY <br />P.O. BOX 310 SAN LUIS. COLORADO 81152 0310 1719) 67?-?362 FAX p 19) 672 336? <br />