My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP52483
DRMS
>
Back File Migration
>
Report
>
REP52483
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:57:02 AM
Creation date
11/27/2007 1:21:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001005
IBM Index Class Name
Report
Doc Date
5/21/2004
Doc Name
Annual Report
From
Continental Materials Corporation
To
DMG
Permit Index Doc Type
Annual Reclamation Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional Sheet <br />2004 Annual Report <br />Grisenti Farms Pit <br />M-2001-005 <br />Continental Materials (Castle Concrete Company) <br />Anniversary Date: May 23 <br />Overview of Permit Year: During the 2003 j2004 operating year there was no activity at the site until right at <br />the end of the permit year. During the last month operations were initiated at this site. However, no extraction <br />occurred. As of May 20, 2004, when the inspection was done for this annual report, part of the plant site had <br />been cleared and some initial setup of the plant site was begun. <br />Annual Report Maps: The annual report map included with this report shows the location of the affected <br />land. <br />Affected Lands: As of the anniversary date, a total of 3.02 acres had been affected. <br />Revegetation: The operation has just begun so no reclamation has been done. <br />Expected Activity (2004-2005): Through the summer of 2004 the plant will be established as well as access <br />routes, the bridge across Brush Hollow Creek, and the sediment and water source ponds excavated. Gravel <br />removed from those ponds will be used to finish the plant site and the remainder will be processed. By late <br />summer ox early fall, Phase 1 operations will begin and will continue to the end of the next permit year. <br />Continental Materials (Castle Concrete) 2004 Annual Report M-2001-005 Grisenti Farms Pit Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.