Laserfiche WebLink
~.atrt6ert anb ~g~ociate~ <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />'1 <br />DAILY FIELD REPORT <br />PROJECT NUMBER: M97181MT <br />PROJECT NAME: Bowie Resources Gob Pile <br />PROJECT LOCATION: Paonia, Colorado <br />CLIENT: Farnsworth Construction <br />CONTRACTOR: Farnsworth Construction <br />DATE: Friday, 8-15-97 <br />TECHNICIAN: Conner <br />WEATHER CONDITIONS: Clear <br />WORK REQUESTED: Density tests <br />FOREMAN: Mrs. Pat Farnsworth <br />WORK PERFORMED BY LAMBERT AND ASSOCIATES REPRESENTATIVE AND REMARKS <br />I arrived at the project site at 6:00 P. M. as requested by Mrs. Pat Farnsworth. <br />I performed soil density tests as requested by Mss. Farnsworth of material being <br />placed on the gob pile, using nuclear soil density test methods. Please refer to <br />the test results sheets for approximate testllocations and test results. The test <br />results indicate only the relative compaction and soil moisture content of the <br />material tested the elevation and location tested at the time of our site visit. <br />J <br />~~ <br />a. o. eoz 7000 v. o. Eoz oa/e 311 SODO DA. <br />ORANO JUNCTION, CO 01007 YONTAOSE, CO 01103 OURANOO, CO 01301 <br />(070) 311.Of00 (970) 31ti7111 (070) 360.OOM <br />