Laserfiche WebLink
~J <br />ANIVVAL REPORT <br />INSTRUCTIONS <br /> <br />According to C..R.S. 34-32-116(3), and C.R.S. 34-32.5-116(3)(x), on the anniversary date of [he permit each year, <br />the operator shall submi[ a report and a map showing the extent of current disturbances [o affected land, <br />reclamauon accomplished to date and during the preceding year, new disturbances the[ are anticipated to occur <br />during the ul~cotning year, and reclamation that will be performed during the upcoming year. Please attach such <br />a report and map to enclosed annual report form. (An adequately labeled map the[ clearly delineates and includes <br />the above elements may suffice for a written repott.) <br />If your opera.tiori is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must <br />provide with the .4nnua] Report the following information as required by 2 CCR 407-1, 407-4, and Rules <br />1.13.7(1)(x): <br />(n the condition of the operation at the time of cessation; <br />(ii) what specific measures have been and will be implemented to comply with reclamation, <br />performance standards and Environmental Protection Plan requirements, if they are part of your <br />approved application; and <br />(iii) pietas for resumption of mining operations. <br />Please provide rite additional following information with your Annual Repott, as applicable: <br />Y <br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1), provide an updated statement <br />regazding the sufficiency of the value of the Financial Warranty, specifically: <br />(I) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(x), provide an updated <br />statement regazding.the sufficiency of the value of the financial warranty. Specifically, <br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage <br />credit, and first priority liens on project related fixtures. <br />(ii) Per the requirements of 2 CCR' 407-1,407-4, and Rules 1.15(1)(b), permits secured with a <br />:Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified <br />:independent appraiser, indicating any changes in property value, and a statement summariring <br />any circumstances which may affect the adequacy of the Deed of Trust, or Security A~reemen~ <br />.and the value of the property subject to either of these instruments. <br />The report shall also provide proof that there are no pastdue property taxes. <br />(iii) Per the requirements of 2 CCR 407-1, 407, and Rules 4.7(3), permits secured with an <br />:Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form <br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the <br />:Letter of Credit does no[ exceed teri percent (10%) of the bank's capital surplus accounts. <br />(vi) Per the requirements of 2 CCR 407-1, 407, and Rules 4.9.3(c), permits secured by a First <br />:Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br />detail to fully describe the condition, value, and location of all pledged fixtures <br />.and equipment. <br />(b) Per the requirements of 2 CCR 407-], 407-4, and Rules 1.15(1)(c), all monitoring information <br />required as part of the approved permit application, to include the Environmental Protection Plan. <br />(Please mote that if you aze not a Designated Mining Operation, you will not have an Environmental <br />Protection Plan as part of your approved permit.) <br />