2007-11-15_PERMIT FILE - M2007044
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007044
>
2007-11-15_PERMIT FILE - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:18:25 PM
Creation date
11/27/2007 1:19:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
PERMIT FILE
Doc Date
11/15/2007
Doc Name
Preliminary adequacy review
From
DRMS
To
Energy Fuels Resources Corp.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
down gradient of the proposed bulkhead, between the bulkhead and the canyon wall. <br />Since the mine will not flood until the bulkhead is installed at the time of mine closure, <br />the collection of baseline data from the point of compliance well can proceed <br />concurrently with mining. <br />d) Cost estimates for the design, construction and monitoring of the bulk head appear to be <br />insufficient. Division experience indicates costs in the magnitude of 40 to 50 times the <br />$7,000.00 figure given. Enclosed is the Division's estimate for the cost to construct one <br />required and two contingency bulkheads. Please clarify. <br />21) Please identify potential areas for undergroe unlesstthe~e areas are ide tified otential contact with <br />groundwater can not be adequately addre <br />22) It is noted that topsoil will be used for safety berms at both the Whirlwind and Packrat. Based on <br />the fact that there is limited topsoil, the Division will require that waste rock is used for such <br />berms to protect topsoil loss from potential erosion or mixing with non-topsoil materials. <br />23) Please clarify stormwater control measures for the fueling station area. There should be a zero <br />run-off design to contain spillage in the area. Also please clarify that the area will be monitored <br />on a regular basis for fuel spillage and clean-up procedures. <br />24) Please provide construction details for all concrete structures. Steel reinforcements, thickness etc. <br />must be accounted for in reclamation tasks. <br />25) Please clarify measures that will be instituted to prevent collector ditch PD-1 from compromising <br />the topsoil and fill areas that it iransects. <br />26) Does stormwater pond design take into a rd tall tames fortthe designed 100 year evlent e pond be <br />monitored to provide a mimmum free boa <br />This review is preliminary as noted. Responses to the Division's questions may raise other issues that <br />need additional information to resolve. Energy Fuels needs to submit responses to the Division's review <br />no later than December 14, 2007 in order to ensure adequate time for staff review prior to the decision <br />date. <br />The Decision Date is currently December 24th, 2007. Per Rule 2.0 the following schedule is tentatively <br />set: <br />On or before December 24, 2007 Division will issue "Letter of Rational" (Rule 1.4.9(c)). <br />December 27, 2007 Pre- Hearing Conference (PHC), Grand Junction <br />3 working days after Letter of Rational (Rule 2.7.1(5)) <br />December 31, 2007 All Motions filed with the Board <br />2 working days after PHC (Rule 2.6 (1)) <br />January 4, 2008 Written responses to all motions filed with Board (Rule 2.6 (1)) <br />3 working days prior to Board Hearing (Rule 2.6 (1)) <br />