My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-15_PERMIT FILE - M2007044
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007044
>
2007-11-15_PERMIT FILE - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:18:25 PM
Creation date
11/27/2007 1:19:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
PERMIT FILE
Doc Date
11/15/2007
Doc Name
Preliminary adequacy review
From
DRMS
To
Energy Fuels Resources Corp.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memo to Russ Means 6 November 14, 2007 <br />Whirlwind Mine Bulkhead Costs File No. M-2007-044 <br />Task and Cost Item Quantity Extended Cost <br />Equipment: welder and torch $200 x 3 x 1.07 x 1..5 $963.00 <br />Angle iron $296 x 3 x 1.07 x 1.5 $1425.24 <br />#8 thread bar $163 x 3 x 1.07 x I.S $784.85 <br />#8 bevel and flat washers $71 x 3 x 1.07 x 1.5 $341.87 <br />2" schedule ZO pipe $148 x 3 x 1.07 x 1.5 $712.62 <br />Celtite $81 x 3 x 1.07 x 1.5 $390.02 <br />Set Up and Pour Bulkheads <br />Terry Tunnel <br />Rent two each 9 cu. ft. mixers <br />Rent auger feed <br />Rent concrete pump <br />Rent concrete pipe and hose <br />Concrete vibrator <br />Rent roller conveyors <br />Concrete <br />Delay set <br />Plasticizer <br />Type V cement <br />Meals during pour <br />Decline Bulkheads (both) <br />Rent two each 9 cu. ft. mixers <br />Rent auger feed <br />Rent concrete pump <br />Rent concrete pipe and hose <br />Concrete vibrator <br />Rent roller conveyors <br />Concrete <br />Delay set <br />Plasticizer <br />`T`ype V cement <br />1~,'ieals during pour <br />1?acl~ Rat <br />Rent two each 9 cu. ft. mixers <br />:Rent auger feed <br />Rent concrete pump <br />Rent concrete pipe and h.ase <br />Concrete vibrator <br />Rent roller conveyors <br />Concrete <br />Delay set <br />f'lasticiter <br />'Type V cement <br />$500/mo. <br />$250/mo. <br />$2400/mo. <br />$3S0/mo. <br />$60/mo. <br />$2S0/mo. <br />$6679 <br />$248 <br />$136 <br />$280 <br />$345 <br />$S00/mo. x 2 x 1.5 $1500.00 <br />$250/rno. x 2 x 1.5 $750.00 <br />$2000/mo.x 2 x 1.5 $6000.00 <br />$350/mo. x 2 x 1.5 $1050.00 <br />$60/mo. x Z x i .5 $180.00 <br />$250/mo. x 2 x 1.5 $750.00 <br />$6679 x 2 x 0.21 x 1.5 $4207.77 <br />$248 x 2 x 0.21 x 1.5 $156.24 <br />$136 x 2 x 0.21. x 1.5 $8S.G8 <br />$280 x 2 x 0.21. x 1.5 $176.413 <br />$34S x 2 x 0.21 x 1.5 $217.35 <br />$5(lfilmo. x 1.5 $ 75t1.Ofif <br />$2501mo. x l.5 $375.0{1 <br />$2000/mo. x 1.5 $3000.00 <br />5350/ma. x 1.5 $525.00 <br />$60/mo. x l.S $90.00 <br />$250/tno, x 1.5 $375.00 <br />$6679 x 0.38 x 1.5 $3807.03 <br />$248 x 0.38 x l.S $141.36 <br />$13fi x 0.38 x l.5 $77.52 <br />$280 x 0.38 x 1.5 $1.S9.6E} <br />
The URL can be used to link to this page
Your browser does not support the video tag.