Laserfiche WebLink
Memo to .Russ Means 3 November 14, 2007 <br />Whirlwind Mine Bulkhead Costs File No. M-2007-044 <br />Task and Cost Item Ouantity Extended Cost <br />Lower Decline Bulkhead 50 x 0.21 = 10.5 hrs. <br />Upper Decline 'Bulkhead SO x 0.21. = 10.5 hrs. <br />Pack .Rat Bulkhead 50 x 0.37 = 1.8.5 hrs. <br />Lower .Decline Bulkhead $874 65 <br />Z laborer inside @ $41.65/hr. ea. 1.0.5 hrs. <br />1 laborer outside @ $41.65/hr. 10.5 hrs. $437.33 <br />1 Equip. Op. (light} @ $53.45 10.5 hrs. $561.23 <br />Upper Decline Bulkhead $874.65 <br />2 laborer inside @ $41.65/hr. ea. 10.5 hrs. <br />1 laborer outside @ $41.65/hr. 10.5 hrs. $437.33 <br />1 Equip. Op. {light) @ $53.45 10.5 hrs. $561.23 <br />Pack Rat Bulkhead $1541.05 <br />2 laborer inside @ $41.65/hr. ea. 18.5 hrs. <br />1 laborer outside a' $41.65/hr• 18.5 hrs. $770.53 <br />1 Equip. Op. (light) cr, $53.45 18.5 hrs. $988.83 <br />Build Forms, Set Pipes, Valves, and Reber, Divert Water <br />Terry Tunnel 80 hrs. <br />All Whirlwind Bulkheads 80 x I.07 = 85.6 hrs. <br />All Whirlwind Bulkheads <br />4 laborer inside @ $41.65/hr. ea. 85.6 x 3 = 256.8 hrs. $42782.88 <br />1 laborer outside @ $41.65/hr. 85.6 x 3 = 256.8 hrs. $10695.72 <br />1 Equip. Op. (light) cL. $53.45 85.6 x 3 = 256.8 hrs. $13725.96 <br />Brace :Forms in. Preparation for Concrete 1?our <br />Terry Tunnel, general labor 40 hrs. <br />'Terry Tunnel, welder 2Ct hrs. <br />All Whirlwind Bulkheads, general labor 4L1 x 1.i)7 42.8 hrs, <br /><~ll "~~hirlwir°rd 13xzlkheads, welder 2C} x 1.07 == 21..4 hrs.. <br />Ail Whirlwind Bulkheads <br />3 laborer inside `c~ $41.65/hr. ea. 42.8 :x 3 -:: 1.28.4 hrs. $16043.58 <br />1 laborer outside @ $41.65/hr. 42.8 x 3 -- 128.413rs. $5347.86 <br />1 welder c~, $69.40 21.4 x 3 °= 64.2 hrs. $4455.48 <br />Set up and Paur Bulkhead <br />Terry 3'unnel, general labor 890 hrs. <br />Terry- Tunnel, overtime during pour $21.5'1.30 <br />Terry Tunnel, salary {n~aatagernent) during pear $2987.()S <br />