Laserfiche WebLink
STATE OF COLORADO <br />DlyiSl©N OF RECLAMATION, MINING AND SAFETY <br />Devartment of fVatura! Resources <br />t 313 Sh4>rrrtan St., Room 21 S <br />Dt:nver, Cotc~rado II02t)3 <br />Phone.: (3Q3) $lib-3~Eii <br />FAX: i3Q3) 832-87t)6 <br />DATE: November 14, 2007 <br />TO: Russ Means <br />r j ,~° <br />FROM: Allen Sorenson ~.~' ~„~`~ , <br />RE: Bulkhead Costs, :Energy Fuels Resources Corporation, <br />~r'Vhirlwind .Mine, File No. M-2007-044 <br />CO LO RAll O <br />D I V f. S t U N v t <br />RECLAMATION <br />MiNI.NG <br />~~ <br />SA.F ETY <br />8iil Ritter, Ir. <br />Governor <br />tiareis D. Shcrmatt <br />Executive DircK~tcr <br />Ronald W. (rattan} <br />DiviSiun Director <br />?vaturai Resourcca Trustee <br />Labor Rates and Various Adiustment Factors <br />Em to ees lncludin Overhead and Profit - RS Means 2007 Buildin. Construction Cost Data <br />Laborer $41.65 <br />Equipment Operator (light} $53.45 <br />Carpenter $54.30 <br />Cement Finisher $49.20 <br />Welder $69.40 <br />Ad'ustment Factors: 1996 Tern Tunnel Bulkhead Costs to 2007 Costs <br />Note: one foot added to Whirlwind Mine workings dimensions to account for notching ofbulkheads <br />Decline bulkheads perimeter area (10'+10'+13'+13'}i.6' = 73.6 sq. ft. each <br />Pack Rat bulkhead perimeter area (10'+10'+I3'+13')2.8' = 128.8 sq. ft. <br />Terry Tunnel bulkhead perimeter area (l l'+11'+11'+l 1')8' = 352 sq. ft. <br />Decline bulkheads reduction factor: 73.6!352 = 0.21 <br />Pack Rat bulkhead reduction factor: 128.8/352 = 4.37 <br />:Decline and Pack Rat bulkheads perimeter length 10'+10'+13'+13' = 46 ft. each <br />Terry Tunnel bulkhead perimeter length 11'+l I'+11'+l I' = 44 ft. <br />Decline and .Pack Rat bulkheads increase factor: 4G /44 = 1.OS <br />Decline and :Pack Rat bulkheads cross sectional area 10'x 13' --= 130 sq. ft. each <br />`.ferry Tunnel bulkhead cross sectional area 1 l.'~11' = 121 sq. ft. <br />Decline and Pack .Rat bulkheads increase factor: 13{)1121 -= 1..f17 <br />Decline bulkheads vol.urne: 7.7 ~ ct. yd. each. <br />l~aek :Rat bulkhead volutr~te: I3.S cu. yd. <br />'f`erry "1`unnel. bulkhead volume (1 l.'~ 1.1'x8');27 cu. ft.;fcu. yd.:~: 35.9 cu.. yd. <br />Decline bulkheads reduction factor: 7.7135.9 -- (i.2I <br />Pack Rat bulkhead reduction factor: i 3.5135.9= 0.38 <br />19961aborer $1.6.39/hr. + 35% benefzts == $22.13i'hr. <br />2007 laborer $41.65~'hr. <br />labor increase factor ~: 41.C-,5r`22.1.3 -.::1.88 <br />.----_-_~-------_-- ------~' _~____.____ Qificc: of <br />--. t)fiic:e of Active and !nac-rive hhines <br />t)t.ntier C;rand )unction Durango <br />'tiAined l,anr Rer!a.matior. <br />