Laserfiche WebLink
5. The application materials do not contain any monitoring or mitigation plans for groundwater or <br />surface water, with the exception of the water in the sediment pond. In that the proposed operation <br />has the potential to negatively impact water quality in both surface and groundwater, the applicant <br />should submit a monitoring plan to the Division for review and include a mitigation plan should the <br />monitoring show impacts to water quality. <br />cc: Carl Mount, DRMS (via email) <br />Berhan Keffelew, DBMS (via email) <br />Allen Sorenson, DBMS (via email) <br />David Bird, DRMS (via email) <br />