My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-10-25_REPORT - M1992069
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1992069
>
2005-10-25_REPORT - M1992069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 12:48:46 PM
Creation date
11/27/2007 1:18:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992069
IBM Index Class Name
Report
Doc Date
10/25/2005
Doc Name
Annual Report
From
Aggregate Industries - WCR Inc
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: ~ J3'ill.~ ~~~' C-OS`~ <br />Division of Minerals and Geoiogy <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Permit No. M-92-069, 83rd Joint Venture <br />Annual Report, Map and Well Monitoring Data <br />Ladies and Gentlemen: <br /> <br />~~~ <br />t!z`~• US T R€ES <br />Enclosed is Check Number in the amount of $688.00 together with the annual report and map for <br />the above-referenced permit. <br />Mining of this site was completed in 2003, and the aggregate processing plant and asphalt plant, located <br />in the eastern portion of the site (Phase I) were removed. Material stockpiles and miscellaneous <br />equipment remain within the north-central area of the project, while sales of processed material and the <br />reclamation phase of mining activity continues. <br />Reclamation activity completed in 2004 included grading and sloping along the north boundary of Phase <br />2. Backfilling and sloping of the peninsulaz feature in the Phase 2 azea was also completed in 2004. <br />Dewatering of Phase 2 ceased in 2004, allowing the Phase 2 pond area to begin filling with groundwater. <br />All upland azeas of Phase 2 were seeded with a cover crop in 2004. Additional seeding of theses azeas is <br />projected for 2005. <br />Phase 1 reclamation activity included backfilling additional azea along the north boundary. Additional <br />backfill, grading and sloping in Phase 1 is projected for 2004. <br />In accordance with reporting requirements for this operation, well monitoring data from 2004 is also <br />submitted herewith. <br />If you need additional information, please call me at (970) 336-6526. <br />Very truly yours, <br /> <br />Connie Nickle Davis <br />Land Resources Assistant <br />Enclosures <br />cc: Aggregate Industries-WCR, Ina -Corporate File, Plant File <br />Aggregate Industries <br />West Central Region, Int. <br />1707 Cole Blvd., Suite 100 <br />Golden, CO 80401 <br />Telephone:303-985-1070 An Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.