Laserfiche WebLink
~ III IIIIIIIIIIIIIIII ~ ~~o;P(,~ <br />DEPARTMENT OF NATURAL RESOURCES <br />David H. Getches, Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Director <br />Richartl D. Lamm <br />Governor <br />DATE: March 4, 1986 <br />T0: Randy Price <br />FROM: Cathy Begej <br />RE: CERTIFICATION REQUIREMENTS FOR ACTIVE UNDERGROUND WASTE DEVELOPMENT <br />PILES AT CWI (C-83-038) <br />During the complete inspection on February 27, 1986, it came to our attention <br />that the waste pile fill quarterly certifications were not being done. CRS <br />34-33-122(1) and Rule 4.09.1 (11) legislate that all fill structures be <br />certified that they are being built as designed by a professional engineer <br />during construction phases. This should be done on a quarterly basis and <br />submitted to the Division within two weeks of the inspection. We recommend <br />that you request that CWI resume quarterly certification of any active piles <br />at once, and submit documentation for the first quarter of 1986. <br />/vj r <br />8127E <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />