Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.6(13) <br />Mine: Southfield <br />NPDES ID. No.: Pond #4 <br />Inspection Period: 4-qtr 2000 <br />Inspection Date: 10-Nov-00 <br />General Description or Reference to Site Plan: <br />This pond is located on the north east corner of the refuse disposal area. It is a sediment control <br />facility receiving run-off from the refuse disposal area. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: Excellent oderate Few Poor <br />2). Erosion forming Gullies: Extensive Some ew None <br />3). Is wave action causing erosion: <br /> On the Upstream embankment? Yes No )C <br /> At the principal spillway inlet? Yes No X <br />4). Erosion of the downstream toe of the embankment? Yes No X <br /> Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? Yes No X <br /> Could this seepage cause potential instability? <br /> <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? Yes X No <br />2j. Is the inlet free of debris and restrictive material? Yes _ ~ No <br />3). Is she discharge outlet free of restrictive material? Yes c No <br />4). Is erosion occurring at the discharge outlet? Yes No X <br /> Evaluate the severity: Extensive Moderate Just starting None <br />Page 1 of 2 <br />