My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP52127
DRMS
>
Back File Migration
>
Report
>
REP52127
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:56:45 AM
Creation date
11/27/2007 1:15:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Report
Doc Date
1/23/2001
Doc Name
SOUTHFIELD MINE & COAL LOADOUT QTRLY SEDIMENT POND INSPECTIONS CERTIFICATION OF QTRLY INSPECTIONS
From
RONALD G THOMPSON
To
ENERGY FUELS COAL INC
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.6(13) <br />Mine: Southfield <br />NPDES ID. No.: <br />Inspection Period: <br />Inspection Date: <br />Pond #2 (WaterStorage) <br />4-qtr 2000 <br />10-Nov-00 <br />General Description or Reference to Site Plan: <br />This pond is located east of the preparation plant facility. The pond is partially incised with <br />moderate interior and varying exterior slopes. The pond interior is hypalon lined and the <br />perimeter is fenced. The water level is manually controlled by the operator. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: Excellent oderat ' Few Poor <br />2). Erosion forming Gullies: Extensive Some ~ None <br />3). Is wave action causing erosion: <br />On the Upstream embankment? Yes No X <br />At the principal spillway inlet? Yes No x <br />4). Erosion of the downstream toe of the embankment? Yes No X <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? Yes No <br />Could this seepage cause potential instability? <br /> <br />PRINCIPAL SPILLWAY <br />?). Is the principal spillway system in working ordef? Yes //f{ No <br />2). Is the inlet free of debris and restrictive material? Yes <br />x No <br />3j. Is the discharge outlet free of restrictive material? ~ ~ <br />Yes~T No <br /> ~ <br />4). Is erosion occurring at the discharge outlet? Yes ~ <br />A No <br /> Evaluate the severity: Extensive Moderate Just starting None <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.