Laserfiche WebLink
.~ <br />QUd rterly CO71eCtlOn OT Field Samples. The Tield parameters listed on <br />Table 4G, Field Parameters List, will be taken on a quarterly basis and <br />included in the annual hydrological report. <br />Visual Inspections of Samples. During the quarterly samplin of <br />alluvial wells the water samples are visually inspected fo 11 and <br />grease. This is done to assure that oil and grease from operation <br />is not penetrating the alluvium. The results of visual spections will <br />be noted on the annual hydrological report. <br />Annual Hydrological Report. An annual hydrol cal report is submitted <br />to the Division on March 15 of each year. <br />.,: <br />`.Nr: <br />Y`. <br />2.04-30t ~-~"~' <br />._:. <br />