<br />Eagle -Gypsum, Ltd. <br /> <br />Alpine Bank Building • 0705 E. Chambers Ave. <br />P O Box 1630 • Eagle. Colorado 81631 <br />(3071 3 7 8-1 OBB • Telex N 1561x87 . FAX p (303) 3781089 <br />T0: MINED LAND RECLAMATION DIVISION <br />SUBJECT: ANNUAL REPORT FOR EAGLE-GYPSUM MINE, PERMIT M-84-091 <br />DATE: 11 DECEMBER 1989 <br />AFFECTED AREA AS OF DECEMBER 1989 <br />MINOR: Areas in original mining location which <br />have been filled where possible and seeded, but <br />not released 1.65 ac 1.65 ac <br />MODERATE: Area in original mining location <br />which has been graded for reclamation, storage <br />area, settling pond 3.53 ac <br />Area in new mining location used for storage <br />and operations 4.08 ac <br />Onsite ways--haul roads 3.17 ac <br />10.78 ac 10.78 ac <br />MAJOR: Area in original mining location which <br />contains "fines" stockpiles which are being <br />removed and used in reclamation and areas of <br />previous mining which has not been reclaimed 2.40 ac <br />Area in new mining location of mining and <br />overburden stockpiling. 4.22.ac <br />6.62 ac 6.62 ac <br />Total affected area as of December 1989 19.05 ac <br />Total affected area as of December 1988 18.22 ac <br />Total area affected during 1989 operation 0.82 ac <br />There was no reclamation work conducted on any of the affected <br />area during 1969. <br />In March of 1989, Eagle-Gypsum, Ltd. entered into a joint venture <br />to finance and construct a gypsum wallboard plant. The name of <br />the joint venture is Eagle-Gypsum Products. <br />During the summer, much of the claim area was studied and <br />development drilling conducted under STATEWIDE PROSPECTING BOND <br />No. 874-817 #3. Mine production to serve the wallboard plant as <br />well as other markets will be substantially greater than the <br />production from the mine in the past. The increased production <br />requirements and the results of the development drilling program <br />make it necessary to amend the mine and reclamation plans for <br />these operations. These amended plans are in process and will be <br />submitted to the Mined Land Reclamation Division in late December <br />or early January. It is anticipated that amended plans will <br />include plans for the reclamation of some of the existing <br />affected area during 1990. <br />