My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP52023
DRMS
>
Back File Migration
>
Report
>
REP52023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:56:40 AM
Creation date
11/27/2007 1:14:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
1/24/1994
From
RCG HAGLER BAILLY INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1.0 INTRODUCTION <br />This report summarizes the results from the fifth and final third-party monitoring trip to <br />Battle Mountain Resources, Inc.'s (BMRI) San Luis Gold Project in Costilla County, <br />Colorado, which took place on October 12 and 13, 1993. The report contains information <br />on: summary and assessment of sampling activities; summary and assessment of analytical <br />activities, and recommendations for future sampling. The following documentation and data <br />are included as appendices in this report: Sampling Observation Documentation, consisting <br />of copies of field notes (Appendix A); Chain-of-Custody Documentation (Appendix B); <br />Analytical Results, consisting of verbatim analytical results from Core Laboratories <br />(Appendix C); Laboratory Quality Control Report (Appendix D); Letter from Core <br />Laboratories regarding reanalyses, exceedence of holding times, and violation of acceptance <br />criteria dated November 15, 1993 (Appendix E); and Letter from Core Laboratories <br />regarding dilution of collection impoundment and lower tailings impoundment samples for <br />high color (Appendix F). <br />2.0 SUMMARY AND ASSESSMENT OF SAMPLING ACTIVITIES <br />One surface water location, three process points and three groundwater welds were sampled <br />during the October 12-13, 1993 sampling trip. The sampling locations were: RS-5 in the <br />Rito Seco Creek; the lower tailings impoundment; the upper tailings impoundment, the <br />collection impoundment, well M-9M-9, well M-12 and well M-13. Three field quality control <br />(QC) samples were taken: one field blank, one rinse blank (taken before collection of the <br />sample from groundwater well M-13), and one duplicate sample taken at groundwater well <br />M-13. A summary of the types of samples collected at each location and the analyzes <br />determined is provided in Table 1. An assessment of the sampling activities is provided <br />below. <br />The weather on October 12 was sunny and windy with temperatures near 6(WF; the weather <br />on October 13 was also sunny, with temperatures near 50°F in the morning. The water level <br />in Rito Seco Creek was low, with silt bars and some gravel in the stream bed. The beaver <br />dam upstream of RS-5 was breached during spring runoff, which likely accounted for the <br />presence of the silt bars in the stream. During the October l2-]3, ]993 sampling trip tailings <br />were being deposited into the lower impoundment, and recycle water was being pumped <br />from the upper impoundment. The second stage of the tailings impoundment (second lift, <br />final height) was being completed, which will result in one large impoundment with no <br />splitter dam. The tailings impoundment underdrains are reportedly producung `50-60 gpm <br />now as opposed to over 200 gpm in the past. <br />As on previous trips, all samples for cyanide determinations were stored in zip-lock bags <br />before putting in coolers to avoid potential cross-contamination of samples. All process <br />point samples were placed in one cooler; RS-5, blanks, and the groundwater samples were <br />RCG/Fiagler Bailly <br />
The URL can be used to link to this page
Your browser does not support the video tag.