Laserfiche WebLink
<br />i <br />Walker to File <br />February 10, 1999 <br />Page ? of 2 Pages <br />of contents of the report miss-cites the 1998 water monitoring as 1999. The Permit requires semi- <br />annual (high and low flow) surface water samples. Samples were taken in July and December. <br />From flow information, high flows aze experienced from May through August, and low flows from <br />December through March. The December Harvey Gap Below Outlet conductivity measurement for <br />1998 exceeded the baseline range [600--867.5--730). However, the higher 867.E reading is below <br />the base-line range of Harvey Gap Reservoir Seep conductivities (867.x-900-1400). The seeps <br />are likely"Fhe probable hydrologic impact is that there would be no water quality impact (Permit, <br />page 63). <br />C:\ WPDOCS\ahrrvw97.063.doc <br />CC: Dan Hernandez <br />