My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP51994
DRMS
>
Back File Migration
>
Report
>
REP51994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:56:39 AM
Creation date
11/27/2007 1:13:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980003
IBM Index Class Name
Report
Doc Date
9/15/1982
Doc Name
HAYDEN GULCH MINES SECOND QTR WASTE PILE INSPECTION REPORT
From
MLR
To
BRIAN MUNSON
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. .~- INSPECTION REPORT <br />HAYDEN GULCH MINE `+~~- 1 ~ 'v`-'' <br />H-G COAL COMPANY - OWNER CG~~. ~~~'- :- ~.`•.3 C~;'S. C~:,: _ <br />YAFIPA MINING COMPANY-CONTRACT OPERATOR <br />JUNE 28, 1982 <br />The permanent waste dump located in the east half of Section 30, <br />TSN, R88W was inspected June 28, 1982. The following observations <br />were made as required in the Surface Coal Mining and Reclamation Oper- <br />ations - Permanent Regulatory Program. The area boundaries on the <br />attached map are only rough approximations. <br />1. Area A-1 is reclaimed with vegetative growth evident. All <br />slopes in area A-1 are 3:1 or flatter and appear stable. <br />Area A-2 is reclaimed with vegetative growth evident. This <br />area contains slopes as steep as 2.3:1 but is a cut slope, <br />not a fill embankment, and it appears stable. <br />2. Area B has been recontoured, topsoiled, seeded, and mulched. <br />No vegetative growth is evident as yet. All slopes in Area <br />B are 3:1 or flatter and appear stable. <br />3. Area C is the active waste dump area. There are slopes in <br />area C which are steeper than 3:1, but these are temporary <br />in nature and will be dozed to 3:1 or flatter when the dump <br />crest in area C reaches its design elevation. <br />4. Area D has been recontoured to a 3:1 slope. The area is <br />ready for topsoil and seeding. <br />5. Drainage from the dump area is controlled by interceptor channels <br />and sediment control structures so as not to degrade surface or <br />ground water. <br />6. The waste dump is being constructed using recognized professional <br />standards. <br />~~ 14W~~~I1 I: ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.