My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-16_INSPECTION - M1999003
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1999003
>
2007-11-16_INSPECTION - M1999003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:18:28 PM
Creation date
11/27/2007 1:12:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999003
IBM Index Class Name
INSPECTION
Doc Date
11/16/2007
Doc Name
Inspection report
From
DRMS
To
Jerald Seifert & Fred Lowry
Inspection Date
10/12/2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinst Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 004 State :Colorado Permit/job# : M-1999-003 <br />Date <br />User: <br />County :Fremont <br />Site :Tallahassee Pit <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $48.36 NA <br />Operating cost/hour : $56.19 100 <br />Ripper op. cost/hour : $0.81 15 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $138.14 Total fleet cost/hour : x138.14 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 7,895 BCY factor : 1.429 volume : 11,279 LCY <br />Source of estimated volume :Permit Application <br />Source of estimated swell factor : Circes <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 250 feet <br />Unadjusted hourly production : 350.0 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 4.00 % (I <br />Average site altitude : 7,800 feet <br />Material weight : 1,600 Ibs/LCY <br />Weight description <br />Top Soil <br />Operator skill : 1.00 <br />Material consistency : 1.20 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.70 <br />Push gradient : 0.93 <br />Altitude : 0.93 <br />Material weight : 1.44 <br />Blade type : 1.00 <br />Net correction : 0.86 <br />Adjusted unit production <br />Adjusted fleet production <br />1 shifUday) <br />(Cat <br />HB) <br />302.01 LCY/hr <br />302.01 LCY/hr <br />JOB TIME AND COST <br />Fleet size : f Dozers) Total job time : 37.34 Hours <br />Unit cost : $0.457 /LCY Total job cost : x5,159 <br />11/13/2007 <br />AJW <br />Abbreviation :none <br />Filename : M003-004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.