Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br />E~~ INECA <br />S Coa/Company Seneca Coal Company <br />RECEIVED <br />MAR 0 g 2000 <br />Division or Min6rab 8 Geobgy <br />March 7, 2000 <br />Mr. Michael Boulay <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Seneca II Mine - Wadge Highwall Drainage Fill <br />Dear Mr. Boulay: <br />Attached please find a copy of the fourth quarter inspection <br />report for the above-referenced fill. Reclamation grading had <br />been deferred in the West Wadge Pit due to the conditions of <br />Technical Revision No. 16. The entire inspection area has now <br />been completely reclaimed with only some final drainage riprap <br />deeding to be installed. With the next technical revision to be <br />submitted, Seneca will propose that this quarterly inspection be <br />ceased since only minor maintenance repairs will need to be done <br />from here on out. <br />:[f you have any questions, please call me. <br />Sincerely, <br />~~/. <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />Attachment <br />c,: Dennis Jones (SCC) <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 61639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />