Laserfiche WebLink
lAL COMPANY REFUSE PILE SITE INSPECTION REPORT <br />4~" + 9s~7 <br />,NSPECTOR'S NAME: ~iM S+OJiElZ <br />dSHA I.D. NO.: 1211-CO-9-0020 <br />DATE: Ij - i g -~`l <br />DATE LAST INSPECTED: n1 -30 -87 <br />iITE NAME: Cameo Refuse Disoosal Area LOCATION: CRDA #1 <br /> <br />MINE NAME: Roadside Mine -Cameo No. I Mine LOCATION: RDA #2 > <br /> <br />I. Compaction tested (within last quarter) yes ~no <br />i. Burning* (specify extent E location) yes ono <br />3. Seepage* (specify Location, color E estimated quantity) <br /> Isolated points on embankment slopes yes no <br /> At natural hillside .. ... ... yes ono <br /> From downslope foundation area .. yes lino <br /> Underdrains .. .. yes K no <br />~. Cracks or scraps in crest* yes ~( na <br />S. Sloughing or bulging*. yes }( no <br />6. Major slope erosion problems yes (ono <br />7. Rilling or gullying in slope . yes 1C no <br />8. Surface movement _yes ono <br />9. Erosion of toe* _yes I~no <br />0. Water impounded against toe*. _yes f~no <br />1. Diversion ditches: <br /> Clogging .. _yes ~( no <br /> Erosion yes yyno <br />2. Could failure of facility create an impoundment? _yes 1~no <br />Major adverse changes in items marked (*) could cause instability and shall be reported <br />to the CMLRD for further evaluation. Adverse conditions noted in these items shall be <br />described (extent, location, volume, etc.) on the back of this sheet. <br />