My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP51867
DRMS
>
Back File Migration
>
Report
>
REP51867
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:56:33 AM
Creation date
11/27/2007 1:11:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Report
Doc Date
2/16/2000
Doc Name
1999 ANNUAL HYDROLOGY REPORT PN C-81-071
Annual Report Year
1999
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TABLE 1 (Continued) <br />HYDROLOGIC MOMTORING SITES <br />SURFACE WATER SITES <br />SITE MONITORING FREQUENCY COMMENTS <br />Water Level or Water Quality <br />Flow & Field Sampling <br />Parameters <br />Foidel Creek <br />USGS 09243800 Monthly Quarterly Ili & I L <br />14 Monthly Quarterly 131 <br />8 Monthly Quarterly (11 ~ 1?I <br />USGS 09243900 Monthly Quarterly (2) <br />Middle Creek <br />USGS 09243700 Monthly Quarterly (2) <br />• Fish Creek <br />16 Monthly Quarterly (1) & (2) <br />302 Monthly Monthly During irrigation <br /> season only; (1) & (4) <br />1002 Monthly Quarterly (1) & (2) <br />Trout Creek <br />301 Monthly Monthly During irrigation <br />season only'; (1) & (4) <br />69 Monthly Monthly During irrigation <br />season onh: (U ~ H) <br />NOTES: <br />(1) Included with Twentymile Coal Company's hydrologic monitoring program. I I'si~e i. rcmm rd I'r~nn <br />TCC's program anJ continued monitoring is required, CYCC will monitor site. <br />(2) Sampling will be performed on a flexible schedule throughout normal flow period, M:u-ch thruuph <br />September. Within this time frame, flow and field parameters will be measured tssch~c times and four <br />full suite analyses will be conducted. <br />(3) Monthly field samples when flowing; Four monthly lab samples obtained once runoff begins. <br />(4) First headgate of irrigation ditch downstream of mine discharge. Monitoring to begin once Fish Creek <br />Dewatering Facility is functioning. <br />• <br />1:\EN~NVIRONMENTALWFflt179991CY VC\SPECIALXLS <br />
The URL can be used to link to this page
Your browser does not support the video tag.