Laserfiche WebLink
<br />TABLE I (Continued) <br />HYDROLOGIC MONITORING SITES <br />WATER LEVEL MEASUREMENTS <br />SITE <br />MONITORING FREQUENCY <br />COMMENTS <br />Water Level Oely <br />Foidel Creek <br />14 <br />8 <br />304 <br />Foidel Creek AI luvium <br />• 16 <br />302 <br />307 <br />1002 <br />NOTES: <br />Monthly (1), (2) & (3) <br />Monthly (I), (2) & (3) <br />Monthly (1), (2) & (3) <br />Monthly (1), (?) & (3) <br />Monthly (During Irrigation) (I) lH) <br />Monthly (I ), (2) .'~ (3) <br />Monthly (I ). 1'-) ~ 131 <br />(1) Included with Twentymile Coal Company's hydrologic monitoring progrrm. II'silc is renurrcd from <br />TCC's program and continued monitoring is required, CYCC will monitor site. <br />(2) Monthly measurements for water level collected during ice free months: late March or early April <br />through September. <br />(3) These sites are also components of surface stream flow monitoring program. <br />(4) First headgate of irrigation ditch downstream of mine discharge. Monitoring to begin once Fish Creek <br />Dewateriog Facility is functioning. <br /> <br />I.~6MEN VIRONMENTALWiR~19991CY VC~SPECIAL.J<LS <br />