My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-02-16_REPORT - M2001107
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2001107
>
2006-02-16_REPORT - M2001107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 2:29:56 PM
Creation date
11/27/2007 1:08:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001107
IBM Index Class Name
Report
Doc Date
2/16/2006
Doc Name
Annual Fee/Report/Map
From
Northern Colorado Constructors Inc.
To
DMG
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9075 WCR ]0 • Fort Topton, CO 80621 <br />303-857-1754 <br />FAX: <br />~wwoo ~~4ka <br />• e ~, <br />NcC n <br />!PemrN Name: Northern Colorado Constructors Inc. <br />Ipemdt NO: M-2007-707 <br />Operation Name: NCCI Pft # 1 <br />REF: Annual fee and Report ~~ <br />Dear, State Or Coorado <br />Northern Colorado Constructors inc. Aggregate Division annual report is as follows <br />7.) DISTURBANCES TO AFFECT LAND: <br />a. Phase 1 <br /> i. Mining in progress <br /> ii. No Reclamation as of 2/13106 <br />b. Phase 2 <br /> i. Mining in progress <br /> ii. No Reclamation as of 2/13106 <br />c. Phase 3 <br /> i. Topsoil Removed <br />d. Phase 4 <br /> i. Topsoil Removed <br />e. Phase 5 <br /> i. Topsoil Removed <br />f. Phase 6 <br />i. Topsoil Stockpile Area <br />g. Phase 7 <br />I Pit Entrance <br />ii. Certified Scale in operation. <br />iii. Gravel Processing Equipment in place and operation as 5/04 <br />2.) UPCOMING YEAR OCCURRENCES: <br />a. No Reclamation Occurrences as of 2/13/06. <br />b. As of 2/13/06 Phases # 3, 4, 5 have been overlotted and being <br />prepared to extract gravel. <br />c. Phases # 1, 2 will become fresh water supply for processing <br />equipment. <br />d. Screening Operation <br />3.OTNER: <br />a. Nona <br />)A7t~~ 3 SAd~..C <br />Chris Zadel <br />Construction Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.