Laserfiche WebLink
The Streeter Fill Certified Inspection Reports contained in <br />• Exhibit 6 confine there has been no significant changes noted <br />in the survey monuments, the piezometer well and no formation <br />of any springs or seeps. <br />Various surface cracks in the topsoil resulting from minor <br />topsoil settling have previously been noted and monitored, but <br />no evidence of surficial slope failure has been noted. In <br />summary, no significant changes have occurred in 1994. <br />B. Section 16 Fill <br />During construction of the Section 16 Fill, the Division <br />received copies of quarterly inspection reports and <br />certifications for the Fill. The Division was notified in the <br />fourth quarter, 1994 report that "construction" of the Fill <br />was completed and Colowyo was entering the "monitoring" phase <br />of the Fill. As such, the certified inspections, piezometer <br />well testing and monitoring of the 4 survey monuments will be <br />conducted quarterly and submitted only in Annual Reclamation <br />Reports. <br />Response <br />The 1994 survey information, certifications and piezometer <br />well information is located in Exhibit 7, Section 16 Excess <br />Spoil Fill. <br />The survey information consists of just two survey dates so it <br />is premature to generate graphs necessary to provide an in <br />depth analysis of survey results. <br />• 6 <br />