Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />m~~I;S~~iS IiAN~I ~ ULVL~v>i'(~iG[V'I'~OMI'ANY <br />X'!' ICS <br />7149 caul ~ unc~¢ SI. <br />Lil Melon. Colorado 80120 <br />Phone (303) 794-0394 <br />May 25, 1989 <br />Carbondale, Colorado 81623 <br />Phone (303) 963.2335 <br />~~~~~~~~ <br />JUN ~' O 1g8~ <br />Mrs. Diana Bills <br />Colorado Mined Land Reclamation Board <br />1313 Sherman Street Suite 215 <br />Denver, Colorado 80203-2273 <br />Dear Mrs. Bills <br />Re: Annual Report - p1LR File NO. M-77-098 <br />Sievers Ranch Pit - Garfield County <br />MIN~p SAND <br />~~Cr-AMATION JlVlsrpr~ <br />~~' <br />The anniversary date of this permit is June 30, 1989. Mobile <br />Pre-Mix, Company took over the lease on December 1, 1986 and <br />continued to operate the pit this year. <br />We will deal specifically with each of the Annual Report questions <br />as outlined in Section 2.41 of the Rules and Regulations. <br />2.41 <br />(1) Mining continued in Stage I as approved in the application. <br />Approximately 1.73 acres of new land was disturbed along the <br />south side of Stage I (cross-hatched brown). In addition the <br />floor of the mine was lowered an additional 6 feet in the <br />southeast part of Stage I (brown). This lowering of the <br />floor gets them to the first bench level. Wash plant settling <br />ponds were constructed on the upper level in Stage II (blue). <br />Stage P is still being utilizes as an equipment storage area <br />and plant site. Topsoil was temporally stockpiled on Stage <br />IV until it is needed for re-soiling Stage I (gray). Please <br />refer to the 1989 Annual Report Map attached. <br />(2) No reclamation was required this year. Approximately 250 <br />linear feet of sloping was completed in Stage I this year <br />(green). Six to eight inches of topsoil was spread on the <br />slope in preparation for seeding. <br />(3) Mining will continue in Stage I on the lands previously <br />disturbed. Mobile Pre-Mix will continue to mine on level 1 of <br />Stage I, ie. the top 30 feet of material. This will lower <br />floor to the first bench level (tan). In addition the remaining <br />0.73 acres ± left in the southeast corner of the stage will be <br />mined (cross-hatched tan). When that is complete they will <br />start mining the second level of Stage I. <br />