My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP51382
DRMS
>
Back File Migration
>
Report
>
REP51382
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:56:07 AM
Creation date
11/27/2007 1:05:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Report
Doc Date
12/6/2002
Doc Name
2nd Quarter 2002 Certification Fill Area # 9 (June 27, 2002)
From
Peak Project Management, LLC
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ __ _ <br /> ~ ' , <br /> / <br />~; <br />7 _, <br />~r INSPECTION OF EXCESS SPOIL FILL <br />f, ~ Second Quarter 2002 Certification <br />Fill Area No. 9 <br />Date: . ' ,~ 7 2002 . <br />G;:.~~^.AL DESCRIPTION OR REFERENCE TO S[TE PLAN: <br />The CTL Thompson report dated April 27, 2001, "Stability Analysis and Geotechnical Recommendations <br />Lorencito Surface Mine Phase I" addresses the general requirements as also cited in Sections 4.09.1 to <br />4.09.2 of the Colorado Mined Land Reclamation Board for Coal Mining. <br />ACFIVITY DURING INSPECTION: ~1 <br />~rz~ /~cv~ ~~rL'~~~~ a(t LGC Z . <br />-Removal of Topsoil and Organic Matter <br />-Placement of Underdrains ~F ~~e s~i~ ~~ ~ G ~j <br />~~ <br />Installation of Surface Drainage System ~~ 09~+`~ ~ <br />X Construction of Fill ~ ~Lc+~ <br />Placement of Topsoil /" ~~t".c~es~/~ <br />Seeding ~~,Se'~' "_""" l~u.~-- Z7 Z~ ~/- <br />l <br />SEDIMENT CONTROL <br />Sediment pond construction has been completed in accordance with plans submitted to and approved by <br />the DMG and as-constructed survey/drawings certified by Registered Land Surveyor and Registered <br />Professional Engineer. All surface run-off from the fll areas is directed to this sediment control facility. <br />/Jv evt~c~ ~ eu~~sc~vr ~-.- fee ~e~,P~~~~ -- <br />SI'1"E PREPARATION <br />Organic materials such as brush and trees were removed from the proposed fill area followed by topsoil <br />removal. Design criteria did not require keyway cuts for steeper valleys with minimal soil cover (fill #9). <br />/I/v .ems-c.. ~~-~- ~.~ $~K~ s ai s~zP"~'`- °'` S/~-~- <br />-- Lv~cR-- o ~ ~~ , <br />DRAINAGE SYSTEM (UNDERDRAINS) <br />Drain sizes are specified by CDMG regulations for fills which can be classified as Valley Fills. Fill area #9 <br />is not a valley fill. CTL Thompsonrecommended a minimum 6' x 12' triangulaz section(area = 64 SF) for <br />this size fill. As constructed drainages generally were more trapezoidal with a top width of 12', bottom <br />width of 8', and average height of 8' (area = 80 SF). Sandstone recovered from durable "channel" <br />sandstone deposits encountered during [he mining process were used m drain construction. Mirafi 160 <br />fabric was used in lieu of filter material. <br />u <br />
The URL can be used to link to this page
Your browser does not support the video tag.