Laserfiche WebLink
<br />April 2006 - March 2007 <br />Page 3 <br />7) vegetation maintenance. The settling pond area that was <br />reclaimed in 2005 was fertilized and amended with lime to <br />adjust the soil pH. Some small areas where vegetation was <br />sparse were reseeded with the Mountain Mix. <br />8) drainage improvements. The drainage ditch in the county road <br />above the site was improved to prevent concentrated runoff <br />from entering the site and eroding the contoured slopes. <br />Site Reclamation Activity planned for 2007 are; <br />1) monitoring and maintenance of vegetated areas. <br />TERRY TUNNEL AREA - Plate No. 2 (no change - map not included) <br />• During the 2006 reporting year, no additional acreage was <br />disturbed. <br />Activity at this site consisted of; <br />1) weed control and monitoring and maintenance of the reclaimed <br />site. <br />Activities planned for 2007 are; <br />1) monitoring and maintenance of the reclaimed site. <br />SUNNYSIDE BASIN (LAKE E~A4~) AREA - Plate No. 2 (no change - map not <br />included} <br />During the 2006 reporting year, no additional acreage was <br />disturbed. <br />Activity at the site consisted of; <br />• 1) monitoring and maintenance of the planted areas. <br />