Laserfiche WebLink
<br />~~ <br />I^ N I Don Kehn <br />~FOF7 COLLIMS Construction Inc. <br />r_ GENERAL CONTRACTORS <br />Asphalt Puv~ng • Crushed Aggregates • Eorthmoving • trucking • Underground UtJdies • Rotomilling <br />January 28, 2002 <br />FEB 0 1 2002 <br />Division of Minerals and Geology <br />Department of Material Resources <br />131?~ Sherman St., Room 215 <br />Dem~er, CO 80203 <br />REC~EVED <br />Oiuision of Minerals and Geoloplf <br />RE: Timnath Pit, DMG #M-89-056 #112C Annual Report Due 2124102 <br />Dear Sir or Madam: <br />In reference to our mining operation at the Timnath Pit, we are continuing to work in <br />Phase IA as listed per our mining plan. Please refer to attachment A. <br />Mining operations are as indicated in attachment B. The crusher and processing <br />operation remain in this area on top of deposits yet to be mined. The cnlsher will he <br />moved in Spring 2002 to the future site indicated. <br />Temporary wetlands continue to flourish in the southeast portion of Phase 1 A as shown. <br />Expansion of these wetlands has occurred to the west and is developing. <br />Backfilling is complete on the southeast side of Phase lA. Backfilling continues on the <br />southwest side of Phase lA as product is mined toward the west. Backfilling continues to <br />flatten the slope in the northeast section of Phase lA. Grass is taking hold in areas <br />seeded last year. <br />2002 and future mining will continue towards the west in Phase 1 A. Mining will occur in <br />2002 in the area where the cnlsher is currently positioned; however, mining will not he <br />completed in this area until the processing plant is relocated, probably in 2003. <br />We anticipate disturbing an additional eight acres in 2002. <br />Sincerely, <br />k1~ <br />Dan k:ehn <br />Enclosures <br />655() So. County Road 5 • Fort Collins, Colorado 80528 • Phone (970) 226-4111 • FAX (970) 226-4115 <br />2 So. Greeley Hwy. • Cheyenne, Wyoming 82007 • Phone (307) 632-4000 • FAX (307) 632-4016 <br />