Laserfiche WebLink
.._ <br />J (3) Measnre weekly for ooaductiviry, PH, tempuatum, oiYgtwe, settleable solids, and flow for all <br />discharging water from ponds. Test for total suspended solids, tool dissolved solids, and iron oax a <br />month for Outfall 007. <br />(4) Measure water conductivity, PH, temperature, oiUgrease, settleable solids, total suspended solids, total <br />dissolved solids, and iron. Pull suite laboratory analysis (February, May, August, and November oa <br />quarterly schedule), if pond(s) are discharging for Outfalls 001 through 007. <br />(5) Measurro water conductivity, PH, temperature, oil/grease, and flow/depth. Have full suite Laboratory <br />analysis (February, May, August, and November on quarterly schedule and May and November for <br />Semi-Annual schedule) for listed groundwater monitoring wells and surface monitoring stations in New <br />Horizon 1 Mine. <br />(6) Measum water depth for groundwater monitoring wells (GW's). <br />5 <br />