Laserfiche WebLink
5.0 PROBABLE HYDROLOGIC <br />' As noted in Table 2.05.6.(3)-1 of the New Horizon mining permit (C-81-008), all of the expected <br />impacts to the hydrologic system at New Horizon are of little or negligible significance. During this <br />monitoring period no unforeseen or unusual hydrologic consequences were discovered. <br /> <br />11 <br />